AmazonTower2WestFacadeFacingGulchApril22

Amazon Office Towers

Project Details

Location
Nashville, Tennessee
Size
1,000,000 SF office space; 690,000 SF parking garage
Completion Date
Phase 1: Summer 2021 Phase 2: Summer 2023 (expected)

Partners

Client
Southwest Value Partners
Architect
Gresham Smith

BELL is acting as the Construction Manager at Risk alongside Clark Construction to construct the Yards’ first two office towers, which will serve as Amazon’s “Operations Center of Excellence.”

Phase 1: The 25-story building features a 40-foot tall lobby and a “monumental” staircase leading to the second floor. The tower sits atop the 1,460-space parking garage.

Phase 2: The 26-story building will feature a two-story, 6,000-square-foot lobby with an exterior amenity deck with views of the eastern downtown skyline. The projects is being constructed within the footprint of the Amazon Prime 1 Office Tower and Garage project, as it also sits atop the parking garage.

Similar Projects

BELL Team